Main St, Lambeth

This project stretched from west of Colonial Talbot Road to east of Campbell Street along Main street in the Village of Lambeth, with a value of approximately $ 8,300,000.00. Major items included roadwork, paving, concrete curb and sidewalk, sanitary sewers, storm sewers, watermain, electrical streetlight improvements and landscape features.

Tributary “C” Storm Water Management Facility

Tributary C Storm Water Management Facility was a project completed for the City of London. This project was located just off of Wesdel Bourne, creating a new subdivision in a highly sought-after neighborhood.

Hyde Park Road Widening Phase 2

The Hyde Park Road Widening Phase 2 was awarded to L82 Construction, it consisted of the construction of a road widening on Hyde Park Road from South Carriage Road to Fanshawe Park Road.

Brookfield Johnson Controls TD Canada Trust Storm Drainage Repairs

L82 Construction was sub contracted by Besterd Mechanical to undertake the civil portion of the storm drainage upgrades for the TD Canada Trust call centre building on York Street in London.

Sunningdale Road and Wonderland Road Intersection Improvements

A new roundabout in the intersection of Sunningdale Road and Wonderland Road in London, Ontario. This roundabout was the second in London and first multilane within the City of London. Major items included roadwork, paving, concrete curb and sidewalk, sanitary sewers, storm sewers, electrical streetlight improvements and landscape features.

Lake Huron Primary Water Supply System Transmission Main Twinning Project Design Build

During the request for quotation stage the L82 team worked diligently to provide LHPWSS with a system that not only provided water through the transmission main but corrected the history from the prior owners of the pipeline to repair all prior defects through the farm lands. With the vision and the forward thinking of the L82 team we were selected as the preferred design build team.

Lake Huron Primary Water Supply System Acoustical Fibre Optic (AFO) Project

L82 Construction joined the Pure Team to design and build the civil works for this project. This included installing 2400 mm concrete structures over the existing transmission watermain and refurbishing existing chambers complete with 4” taps for entry of the acoustical fibre optics into the pipeline.

Mental Health Enabling Works Phase 2

This project was made up of constructing 1500m of up to 350 mm Steel transmission steam mains six monitoring chambers, sanitary sewers, storm sewers, 300mm PVC watermain main and associated road work.

County Road 4 and County Road 35 Transmission Main Construction Contract B

Constructing 4100m of 400mm transmission main along county roads 4 and 35 in Woodstock Ontario. L82 also constructed three air release chambers and three drain chambers; L82 had to directionally drill under the main entrance of the New Toyota Plant and under a major water course.

Springbank Drive Infrastructure Renewal Program

This project consisted of 2.6 km’s of full road reconstruction between Wonderland Road and Horton Street.