Our project team includes experienced project managers, construction managers, on-site superintendents, knowledgeable labours, and talented operators to complete projects in an efficient and timely manner. L82 ensures optimal workmanship while maintaining cost efficiency. Here are some projects our team has completed:

 

Liberty Crossing – Sifton Properties

Liberty Crossing – Sifton Properties

In late 2022, L82 was awarded the site grading contract and in 2023 was awarded the site servicing for the liberty Crossing Subdivision. The project owner is Sifton Properties limited, A prominent developer in Ontario, with a longstanding relationship alongside L82 dating back to the mid-1990s.

Highbury Avenue Widening St. Thomas

Highbury Avenue Widening St. Thomas

In late 2023, St. Thomas issued a prequalification request for the Highbury Avenue Widening project, aimed at enhancing traffic flow for the new VW battery plant.

Main St, Lambeth

Main St, Lambeth

This 8.3 million dollar project stretched from west of Colonial Talbot Road to east of Campbell Street along Main Street in the Village of Lambeth. Major items included roadwork, paving, concrete curb and sidewalk, sanitary and storm sewers, watermain, electrical...

Tributary “C” Storm Water Management Facility

Tributary “C” Storm Water Management Facility

Tributary C Storm Water Management Facility was a project completed for the City of London. This project was located just off of Wesdel Bourne, creating a new subdivision in a highly sought-after neighborhood. The project consisted of clearing and grubbing, topsoil...

Hyde Park Road Widening Phase 2

Hyde Park Road Widening Phase 2

Hyde Park Road Widening Phase 2 was awarded to L82 Construction and consisted of widening Hyde Park Road from South Carriage Road to Fanshawe Park Road. Hyde Park Road is an arterial road within the City of London, and was the second of two phases on Hyde Park Road...

Brookfield Johnson Controls TD Canada Trust Storm Drainage Repairs

Brookfield Johnson Controls TD Canada Trust Storm Drainage Repairs

L82 Construction was sub contracted by Besterd Mechanical to undertake the civil portion of the storm drainage upgrades for the TD Canada Trust call centre building on York Street in London. The need for a drainage upgrade for the owner was required due to water...

Sunningdale Road and Wonderland Road Intersection Improvements

Sunningdale Road and Wonderland Road Intersection Improvements

Sunningdale Rd. and Wonderland Rd. intersection improvements was awarded to L82 Construction and consisted of a new roundabout at the intersection of Sunningdale Road and Wonderland Road in London Ontario. This roundabout was the second in London and first multilane...

Springbank Drive Infrastructure Renewal Program

Springbank Drive Infrastructure Renewal Program

This project consisted of 2.6 km’s of full road reconstruction between Wonderland Road and Horton Street. Major items for this project included sanitary sewer, storm sewer, 400mm transmission watermain, and surface restoration. Two lanes of traffic had to maintain at...

Innovation Industrial Park Phase 1, 2 and 4

Innovation Industrial Park Phase 1, 2 and 4

This project consisted of constructing 3500m of 600mm water transmission main including drain, air release and meter chambers, SWM facilities, storm, sanitary and road work. There were two keys to success with this project. They were controlling ground water and...

Dundas Street Gateway Project

Dundas Street Gateway Project

This project consisted of constructing 3000m of up to 450mm water transmission main on Dundas Street in London, Ontario. The project was constructed in a primarily commercial area. The big box stores and restaurants within the limits of construction made it necessary...

Burbrook Trunk Sewer Phase 4

Burbrook Trunk Sewer Phase 4

This was a City of London project worth $470,000 with the bulk of the work to supply and install 80m of 1950mm diameter storm sewer at a depth of over 6m. The water table was at a depth of 3-4m, thus requiring a well point dewatering system to be used to lower the...

Elgin Water Treatment Plant Shore Protection

Elgin Water Treatment Plant Shore Protection

This project consisted of constructing a new armour stone revetment, and place new armour stone against the existing shore line protection. This project was located in Port Stanley, off of Lake Erie. Construction was completed in January and February 2010. With the...

Twin Creeks Landfill Site Preparation Phase 2

Twin Creeks Landfill Site Preparation Phase 2

Twin Creeks Landfill is located in Watford, Ontario and is one of the first and largest landfills in Canada under the new MOE regulations. L82 was contracted by Waste Management of Canada to help them build a garbage cell, roads, pumping stations, leachate collector...

Hanwha L&C Canada – Innovation Park Grading

Hanwha L&C Canada – Innovation Park Grading

On January 4 2008, L82 Construction was awarded the contract for the earthwork pre-grade for Hanwha L&C Canada. The site is located at Innovation Industrial Park at the corner of Veterans Memorial Parkway and Hamilton Road, in the City of London. Hanwha, a South...